High Quality Aluminum Formwork, Aluminum Alloy, Rib Lath Used for Building Suppliers in China

Home > Products > Formwork > High Quality Aluminum Formwork with TUV Certificate

High Quality Aluminum Formwork with TUV Certificate

Product Description

Certification: SGS, CE, TUV Type: Wall Formwork Usages Times: 200 Times Usage: Villa, High-Rise Building Specification: Customize service HS Code: 84806000 Material: Aluminum Alloy Aluminum Alloy: 6061 T6 Lapping Form: Special-Shaped Scaffolding Trademark: HIGO Origin: Yangzhou City, Jiangsu Province, China       Singular Advantage of HIGO Aluminum Frame Laminated Formwork 1,HIGO Formwork Scaffolding System can effectively increase the product life of special-shaped slabs, helping investors to reduce costs as much as possible. 2,Compared with Al-Alloy formwork, HIGO system is much lower in terms of lump sum. 3,IGO has worked out the problem of special-shaped slabs existing in Al-Alloy formwork, thus can be applied in more circumstances. 4,HIGO adopts 100 times of water-based formwork oil. Therefore, no maintenance is required, which can further cut down the cost of raw materials and labor.

High Quality Aluminum Formwork with TUV Certificate Aluminum Frame wood plywood formwork vs Conventional Formwork  
Compare Plywood Aluminum Frame Laminated Formwork
Size Unordered Standardized
KN 30KN/m² Uneven 60KN/m² Even
Early Removal Hard to operate 3 formworks and 3 scaffoldings Easy to operate 1 formwork and 3 scaffoldings
Cycle time 6-7 days , Long without guarantee 3.5-4 days , Short with guarantee/td>
Efficiency 10-15 m²/day/person 30-50 m²/day/person
Turnover 5-7 times with large waste and loss 100 times ( 600 times for aluminum frame) without waste and loss
Labor Labor shortage; professional skill required Adequate service; proficiency required
Quality Vulnerable, plastering required Invulnerable, shape at one time, no need to plastering, high quality
Wastage Large waste No waste; recyclable
Waste Large waste No waste
Service charge 25-35RMB/ m² Lower than 25-27RMB/m²
Cost reduction on plastering 0 15-25 RMB/m²
Price on green construction 2RMB/m² 0
Tower crane Dependent Independent
    Comparison on economic indicator of common formworks  
Compare San'an formwork Steel Shuttering Formwork Aluminum Formwork Aluminum Frame Laminated Formwork
Material(mm) formwork Steel plate Al-Alloy plate Laminated plywood
Thickness(mm) 13/15 5-6 4 12-15
Weight(kg/m² ) 10.5 85-95 20-25 17-25
Weight to load(kg/m² ) 30 80 60 60
Cost(without strut and components) 60RMB 700RMB 1300RMB 800RMB
Turnover 6 100 100-200 100-200
Value for recycling No and additional cost on disposal Less More More
Operation Hard Normal Easy Easy (without formwork oil)
Cost on maintenance Low High Low Low
Efficiency Low Normal High High
Application        
        ()
Dependence on machinery Partly dependent dependent independent independent

HIGO Aluminum Frame Laminated Formwork Scaffolding System adopts one ecological and energy-reserved material of new generation developed independently-the polymer laminated bamboo-wood formwork and combines it with Al-Alloy system together. So it not just inherits all the advantages in the Al-Alloy shuttering system. What's more, adhesion caused by certain chemical reaction between aluminum formwork and concrete will not be a problem any more. At the same time, it is also a breakthrough explained by the highly-reduced cost.
 

Contact us if you need more details on Formwork. We are ready to answer your questions on packaging, logistics, certification or any Other aspects about Aluminum Formwork、Aluminum Alloy. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Formwork