High Quality Guardrail Pile Driver for Excavator, Fix Pile Driving Machine Pile Driver, Fix Pile Driving Machine Suppliers in China

Home > Products > Pile Driver > Highway guardrail fix pile driving machine

Highway guardrail fix pile driving machine

Product Description

Highway guardrail fix pile driving machine

Product Description

Mainly used in soft soil piling, such as the foundation, seaports, Bridges, reservoirs station, and national defence construction and so on, widely used in rotary screw pile pile engineering, drilling engineering, geological prospecting, building projects, such as engineering blasting and so on.

Description:

1.Pile driving speed,the average 3 minutes can realize piling 6 meters deep,namely a hole 3 minutes to play.

2.Oil province,is a common driver uses around half of a year can be a driver left money for you.

3.Bit using manganese steel manufacturing,through processing,are suitable for all kinds of geological environment.


4.Crawler walking,high walking and climbing ability The frame can be moved back and forth,bit can be adjusted,high piling position accuracy.






Model

LT-20S

Diesel power(KW)

40

Pile diameter mm

114-220

Pile length m

2.6-3.3

Hydraulic system flow(L/Min)

80-110

Rated system pressure(Mpa)

15

wheel track (M)

1620

wheel base(M)

2070

Dimension(L*W*H)

3200*2000*2900

Weight(Kg)

3400

Pile hydraulic hammer weight((Kg)

80

Hydraulic hammer frequency(Bpm)

500-900

Hydraulic hammer working flow(L/min)

40-70

Hydraulic hammer working pressure(Mpa)

11-14

Drill hammer weight(Kg)

60


The photos


-pile driver -machine


pile- driver -machine

FAQ

1.What is the main application for our exploration core drilling rig?

Ans.: Our core drilling rig is suitable for drilling works such as general exploration,geohpysical exploration,road and building exploration,water well drilling,and so on.

2.What is the warranty of our machine?

Ans.:Our main machine enjoys a 6 months warranty(except for wearing parts or special parts),during this time all accessories broken can be changed for a new one.And we provide videos for machine install and operation.

3.What is the lead time and shipping method?

Ans.:Usually the lead time is 3-5 days, and we send the machine by sea.

4.What kinds of payment terms do we accept?

Ans.:T/T or L/C at sight...

Our company also has some related products. Steel Bar Bender,CNC Rebar Bender,Steel Bar Straightening and Cutting Machine,CNC Steel Bar Stirrup Bender,CNC Rebar Bending Center,Rebar Cutting Line

Beed



Contact us if you need more details on Guardrail Pile Driver for Excavator. We are ready to answer your questions on packaging, logistics, certification or any Other aspects about Fix Pile Driving Machine Pile Driver、Fix Pile Driving Machine. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Pile Driver